ISS Daily Summary Report – 10/23/2017

Lighting Effects:  A 51S crewmember conducted a Visual Performance Test by stowing the hardware in their crew quarters, setting the light to the correct mode, turning all other light sources in the crew quarters off, and performing a Numerical Verification Test and a Color Discrimination Test. The completed tests were photographed and downlinked. The Lighting Effects investigation studies the impact of the change from fluorescent light bulbs to solid-state light-emitting diodes (LEDs) with adjustable intensity and color and aims to determine if the new lights can improve crew circadian rhythms, sleep, and cognitive performance.

Astronaut Energy Requirements for Long-Term Space Flight (Energy): Today a 51S crewmember initiated Day 0 activities to support the Energy investigation. The subject donned an armband monitor, set up the Pulmonary Function System (PFS) hardware, and began eating a controlled diet. For this part of the investigation, additionally, a control subject participated, with both crewmembers collecting urine samples at approximately the same time over the next 11 days (Day 0 through Day 10). The Energy investigation measures an Astronaut’s Energy Requirements for Long-Term Space Flight, a crucial factor needed for sending the correct amount of the right types of food with space crews. Nine astronauts will be examined during exercise and rest cycles three months before launch, three months after arriving at space station and adapting to the space environment, and after return to Earth. Physicians will measure metabolic rates, urine content, and bone density to determine energy needs.

Radiation Dosimetry Inside ISS-Neutron (RaDI-N): After retrieving the RaDI-N hardware from the Russian crewmembers, a USOS crewmember deployed eight Space Bubble Detectors around the ISS for the Radi-N experiment. The Canadian Space Agency (CSA) RaDI-N investigation will be conducted by measuring neutron radiation levels while onboard the ISS. RaDI-N uses bubble detectors as neutron monitors which have been designed to only detect neutrons and ignore all other radiation.

Human Research Program (HRP) Collections (Biochemical Profile, Repository): Today a 52S crewmember completed Flight Day (FD) 30 urine and blood sample collections in support of the Biochemical Profile and Repository experiments. The samples were placed in the Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI).

  • The Biochemical Profile experiment tests blood and urine samples are obtained from astronauts before, during, and after spaceflight. Specific proteins and chemicals in the samples are used as biomarkers, or indicators of health. Post-flight analysis yields a database of samples and test results, which scientists can use to study the effects of spaceflight on the body.
  • Repository is a storage bank used to maintain biological specimens over extended periods of time and under well-controlled conditions. This repository supports scientific discovery that contributes to our fundamental knowledge in the area of human physiological changes and adaptation to a microgravity environment and provides unique opportunities to study longitudinal changes in human physiology spanning many missions.

NanoRacks Kestrel Eye Satellite Preparation and Japanese Experiment Module Airlock (JEMAL) Installation: Using the maintenance work area (MWA), the crew prepared the Kestrel Eye satellite for deployment by attaching the satellite to the Kaber, and on the JEM Airlock slide table, the crew attached the Kaber to the JEM CLPA Adapter Plate (JCAP). Following the Kestrel Eye satellite installation, the crew took measurements to ensure that the hardware was within tolerance of the JEM A/L deployment envelope.  The measurements exceeded the tolerances by a small amount, so ground teams are discussing a forward plan.  A decision is expected later this evening.  In the meantime, the slide table was retracted in manual mode and the inner hatch was closed. The JEM A/L has been depressurized.  NanoRacks-SMDC-Kestrel Eye IIM (NanoRacks-KE IIM) is a microsatellite carrying an optical imaging system payload, including a commercial off-the-shelf (COTS) telescope. The investigation validates the concept of using microsatellites in low-Earth orbit to support critical operations. An overall goal is to demonstrate that small satellites are viable platforms for providing critical path support to operations and hosting advanced payloads.

Waste & Hygiene Compartment (WHC) Urine Receptacle Remove and Replace (R&R): Today the crew performed an R&R of the WHC urine receptacle and insert filter. Following the R&R a successful WHC functionality test was performed. 

Space Station Remote Manipulator System (SSRMS) Operations:  On Saturday, Robotic Ground Controllers walked the SSRMS onto the Mobile Base System (MBS) Power Data Grapple Fixture 1 (PDGF1). They then maneuvered the SSRMS to unstow the Special Purpose Dexterous Manipulator (SPDM) from MBS PDGF2. On Sunday, the SSRMS maneuvered to support a survey of the Neutron Star Interior Composition ExploreR (NICER) and Alpha Magnetic Spectrometer (AMS) using the SPDM Camera Light Pan/Tilt Unit (PTU) Assemblies (CLPAs).  Finally, the Mobile Transporter (MT) was translated from Worksite 2 (WS2) to WS7 and the SPDM and SSRMS were configured for the start of the Kaber / Kestral Eye 2M deploy. 

Today’s Planned Activities
All activities were performed unless otherwise noted.

  • Life On The Station Photo and Video
  • Roskosmos and social media features preparation
  • Ryaska – planned experiment hw – search and inventory
  • URAGAN. Observation and photography
  • ECON-M. Observation and photography
  • HRF Generic Urine Collection Male – Subject
  • Orthostatic Tolerance Exercise Reminder
  • HRF Generic Sample MELFI Insertion Operations
  • HRF Generic Frozen Blood Collection – Operator
  • Kestrel Satellite Operations Review
  • Water transfer from tank БВ1 Rodnik in Progress 436 (SM aft) to tank БВ1 Rodnik  in SM
  • HRF Generic Refrigerated Centrifuge Spin Conclude
  • KE2M Maintenance Work Area Preparation
  • HRF Generic Sample MELFI Insertion
  • Combined Satt-1 Maintenance Work Area Relocation Assist
  • Kestral Eye Satellite  Maintenance Work Area Relocation
  • Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Drain
  • Assessing potential increase of air circulation rate in SM working compartment big diameter
  • Kestral Eye Satellite Hardware Gather
  • Health Maintenance System (HMS) Automated External Defibrillator (AED) Inspection
  • Water transfer from tank БВ1 Rodnik in Progress 436 (SM aft) to tank БВ1 Rodnik  in SM – compressor restart
  • JEM Airlock Slide Table (ST) Extension to JPM Side
  • Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Drain Part 2
  • DUBRAVA. Observation and photography using ВСС science equipement. Tagup with specialists
  • Monitoring ИП-1 sensors install
  • HRF Generic Frozen Blood Collection Conclude Stow
  • Kestrel Eye Hardware Preparation and Installation onto JEM Airlock Slide Table
  • HRF Generic Urine Collection Male – Subject
  • FGB ГА – vacuum cleaning
  • HRF Generic Sample MELFI Retrieval Insertion Operations
  • TIMER. Preparing experiment and taking video of experiment start
  • Kestrel Eye Satt Assist
  • Regenerative Environmental Control and Life Support System (RGN) Wastewater Storage Tank Assembly (WSTA) Fill
  • VIZIR. Experiment run. Tagup with specialists
  • СОЖ Maintenance
  • HRF2 PC 2 Swap
  • Pressurizing bladder of tank БВ1 Rodnik in Progress 436 (SM aft)
  • TIMER. Finishing taking video of experiment run and final steps
  • MATRYOSHKA-R. BUBBLE-dosimeters – prep and initialization
  • JEM Airlock Slide Table (ST) Retraction from JPM Side in Manal Mode
  • JEM Airlock Depressurization
  • Photo TV Camera Setup
  • MATRYOSHKA-R. Photographing experiment run
  • Radiation Dosimetry Inside ISS-Neutrons Hardware Handover
  • MATRYOSHKA-R. Handing over Bubble dosimeters to US side
  • Radiation Dosimetry Inside ISS-Neutrons
  • Around the World in 90 Minutes Photography Event
  • MATRYOSHKA-R. Bubble dosimeters initialization and placing for exposure
  • Konstanta-2. Removing cartridge from ТБУ-В and placing on panel for 1 hour for warming up
  • Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Water Recovery System (WRS) Sample Analysis
  • Lighting Effects Visual Performance Tests GLA Setting  – Subject
  • Glacier Battery Remove
  • HRF Generic Urine Collection Male – Subject
  • Unloading US high-priority cargo from Progress 437 (DC1); IMS updates
  • Public Affairs Office (PAO) High Definition (HD) Config LAB Setup
  • KONSTANTA-2. Preparing and performing run 2/Tagup with specialists
  • HRF Generic Sample MELFI Insertion Operations
  • Armband Activity Monitor Setup
  • PAO Preparation
  • Public Affairs Office (PAO) Event in High Definition (HD) – Lab
  • ENERGY Water Sample
  • SpX-12 Debrief
  • Energy PFS Setup
  • IMS Update
  • ISS HAM Service Module Pass
  • Regenerative Environmental Control and Life Support System (RGN) Wastewater Storage Tank Assembly (WSTA) Fill
  • Health Maintenance System (HMS) Vision Test
  • In Flight Maintenance (IFM) Waste and Hygeine Compartment (WHC) Urine Receptacle (UR) and Insert Filter (IF) Remove and Replace
  • Health Maintenance System (HMS) Vision Questionnaire
  • In Flight Maintenance (IFM) Crew Quarters (CQ) Battery Remove and Replace
  • Extravehicular Mobility Unit (EMU) Long Life Battery (LLB) Initiate
  • Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Sample Data Record
  • Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Fill Part 3
  • Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Waste Water Bag (WWB) Changeout
  • Health Maintenance System (HMS) Vision Test
  • JEM Airlock Vent
  • Regenerative Environmental Control and Life Support System (RGN) Wastewater Storage Tank Assembly (WSTA) Fill
  • Unloading US high-priority cargo from Progress 437 (DC1); IMS updates
  • JEM Airlock Vent Confirmation
  • HMS Tonometry Test Setup
  • HMS Tonometry Test Crew Medical Officer (CMO)
  • Assessing potential increase of air circulation rate in SM working compartment big diameter
  • HMS Tonometry Test Subject
  • HRF Generic Urine Collection Male – Subject
  • HMS Tonometry Test Stow
  • Health Maintenance System (HMS) Vision Questionnaire
  • Portable PFS Conclude
  • HRF Generic Sample MELFI Retrieval Insertion Operations
  • Review Emergency OBT Simulator Functionality

Completed Task List Activities

  • MPCC Hardware Gather [GMT 294]
  • Wanted Poster – LS1 Hard Drives [GMT 294]
  • KTO Replace [GMT 294]
  • SAFER Checkout [GMT 295]
  • 85-ft Safety Tether Inspection [GMT 295]
  • MBSU Stow [GMT 295]
  • N1/N2 Diffuser Questionnaire [GMT 295]
  • Veg 03 Pillow Watering [GMT 295] 

Ground Activities
All activities were performed unless otherwise noted.

  • NICER Survey [GMT 294]
  • AMS Survey [GMT 294]
  • MT Translate [GMT 294]
  • JEMAL Operations

Three-Day Look Ahead:

  • Tuesday, 10/24: EVA Loop Scrub, Energy, SABL CO2 Incubator Controller Install, EMU Water Conductivity Test, TPF Spacer Remove and Install
  • Wednesday, 10/25: CSAT Hardware Assembly, WHC Photography, Max CEVIS, EMU Water Dump and Fill
  • Thursday, 10/26: OBT Emergency Simulation, BioLab Container Removal, Fluidics Install and Science Run, Personal CO2 Monitor Deploy

QUICK ISS Status – Environmental Control Group:

  Component

Status

Elektron

On

Vozdukh

Manual

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

Off          

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

Off

Carbon Dioxide Removal Assembly (CDRA) Lab

Standby

Carbon Dioxide Removal Assembly (CDRA) Node 3

Operate

Major Constituent Analyzer (MCA) Lab

Idle

Major Constituent Analyzer (MCA) Node 3

Operate

Oxygen Generation Assembly (OGA)

Process

Urine Processing Assembly (UPA)

Standby

Trace Contaminant Control System (TCCS) Lab

Full Up

Trace Contaminant Control System (TCCS) Node 3

Off